This action was carried out to resolve the technical requirement for a new lighting infrastructure on this pedestrian pathway that connects the neighbourhood of Vallcarca i Penitents with El Carmel.
The project is the result of a participatory process that started in 2022 in which an evaluation was carried out of the need to incorporate new LED technology lighting points along the 160-metre pathway.